Your second compressor starts during peak production, then stays running unloaded after demand falls. Meanwhile, the lead machine maintains a higher pressure than the process needs. Adding capacity has kept production moving, but electricity is being wasted.
Two compressors do not automatically justify a separate central controller. The investment makes sense when coordinated control can reduce avoidable unloaded running or excessive generation pressure.
At J Ll Leach, Atlas Copco authorised distributor in the West Midlands, we assess that decision through energy audits and flow monitoring. The starting point is how your machines work together across a production shift.
Each compressor has local controls governing its operation. A central controller coordinates the machines supplying a shared air network.
With independent control, staggered pressure bands can determine which compressor loads first and when the second joins it. This arrangement can widen the system’s operating pressure range. Atlas Copco’s Equalizer documentation (atlascopco.com) describes managing compressors on a common air network and using two pressure bands for different times of day.
These are separate opportunities. Lowering unnecessary generation pressure addresses one source of waste. Reducing time spent running without delivering air addresses another.
Before choosing hardware, establish which problem exists. If pressure is stable and the second machine rarely runs, the available energy saving may be small.
Multiple air compressor control ranges from a fixed operating sequence to selection based on machine performance. Specify the behaviour you need before comparing controller names.
| Control Approach | Decision It Makes | When to Consider It |
|---|---|---|
| Integrated networking | Coordinates compatible machines through their existing controllers. | Existing equipment already supports the required functions. |
| Central sequencing | Calls machines in a defined order as demand changes. | The main need is coordinated loading, rotation or standby operation. |
| Central optimisation | Selects machines using information about their capacity and power. | Different machine sizes or operating characteristics make a fixed sequence less suitable. |
If both compressors are recent Atlas Copco units, check whether their Elektronikon controllers support integrated networking. Depending on the equipment and options, this may provide common pressure-band control, rotation and backup starting.
Compatibility needs checking against the actual controller versions. Being from the same manufacturer does not establish that every required function is available.
Equalising running hours can support maintenance planning. It does not establish that the selected combination uses the least electricity.
Atlas Copco’s central controller guide (atlascopco.com) distinguishes sequencing based on central pressure from Optimizer 4.0 selection using machine type, size, flow, power and status.
For two similar machines, sequencing may meet the operational need. Different capacities warrant closer assessment, but they do not automatically justify advanced optimisation.
A controller proposal needs an operating baseline. A pressure reading taken during a quiet moment cannot show how two machines respond throughout production.
The useful evidence includes:
Include representative operating conditions. For an Aston engineering site, that could mean shift start, normal machining and reduced staffing periods. The measurement period should capture the conditions driving the decision.
We provide flow monitoring for air compressors and energy audits to assess demand against installed capacity.
That assessment should separate control waste from leaks, pressure losses and equipment sizing. It gives the buyer a basis for comparing controls work with other improvements.
For the equipment and installation services supporting that assessment, see our Birmingham air compressors page.
A variable speed drive, or VSD, compressor adjusts output through motor speed.
Our guide to variable speed drive (VSD) air compressors explains the equipment choice.
In a mixed system, assess the fixed-speed machine’s output alongside the VSD machine’s usable operating range. The relationship matters when demand moves between running one machine and requiring both.
A central controller can coordinate compatible fixed-speed and VSD equipment. Atlas Copco confirms this capability in its Equalizer 4.0 specification (atlascopco.com). The installed interfaces and supported control functions still need verification.
Demand may repeatedly sit above one machine’s capacity but below a suitable combined operating point. The result can be cycling or unloaded running.
A controller cannot change the machines’ physical capacities. Flow logging is needed to establish how often this condition occurs. Resizing the VSD may deserve comparison with a controls investment.
That remains a site-specific decision. The equipment list alone cannot settle it.
Use measured consumption and a proposed operating strategy to estimate the avoidable energy use. Do not apply a general saving percentage to the whole compressor electricity bill.
The basic calculation is:
Estimated annual energy saving in kWh × electricity unit cost = estimated annual electricity cost saving.
Compare that figure with the full installed cost. Include the controller, required interfaces, sensors, installation and commissioning. Account for any ongoing charges included in the proposal.
Simple payback is the installed cost divided by estimated net annual savings. Keep assumptions visible, especially annual operating hours and the amount of unloaded running expected to be removed.
If a proposal includes leak repairs or pipework changes, separate their expected savings from the controller’s contribution. Otherwise, the controls investment may receive credit for improvements achieved elsewhere.
Receiver storage and pipework also affect pressure stability. Investigate restrictions before assuming a controller will correct pressure dips.
Production requirements govern the acceptable outcome. Our article on what air compressors are used for provides application context, but the actual equipment specifications remain the design inputs.
An engineer should determine the operating strategy and pressure requirements. Avoid changing individual machine settings to test a controller proposal.
Before approving the specification, agree how the installation will demonstrate:
Lower electricity consumption is useful only if production remains supplied. Acceptance should compare operation under equivalent conditions and explain any changes in demand.
For a useful assessment, assemble compressor models, controller versions, available operating records, shift patterns and critical process requirements. Add planned production changes. These inputs let an engineer identify the control functions worth specifying before a cabinet becomes the default purchase.